Hydromachine (GM)

Hydromachine (GM) should be prepared to work, but in the process operation to carry out its maintenance (TO), supporting the product in operating condition. Average life of GM 3 to 5 years. The manufacturer guarantees a good job GM (subject to the implementation of and adherence TO Manuals) for (most) 12 months from the date of commissioning (but not exceeding 18 months from the date of shipment to the customer complete). During the warranty period, repair of GM, its assembly units and parts manufacturer produces free. At the end of life should also be renovated to make the company factory. When you enter the GM operation should be checked for completeness and correctness assembly, flush the hydraulic system, and especially the hydraulic tank, kerosene, ridding it of dirt and carefully wiped clean, lint-free, cloth and blow compressed air. After that you should fill in the appropriate hydraulic amount recommended by the working fluid (in the presence of a traffic jam on the protruding part of the "A" to cut it). This is followed (when fully retracted piston MPI) to make sure there oil and its amount in the oil tank (Cans), and if necessary, add oil through the filling openings with filters. Sequence of operations to GM fuel oil is given in the instructions (manual) Manual (IE), as well as volumes of oil and its level (Top of the tank, the bottom edge of the filler plug hole, the axis of the drive shaft pump, etc.) Check oil level in the jack and rihtovschike performed at his tilted at 30 …

Tags: ,

Comments are closed.

© 2012-2024 Somwa.net All Rights Reserved